Iso Ts 220024 Checklist Top [patched] (2024)

Iso Ts 220024 Checklist Top [patched] (2024)

This guide is structured to help you audit, develop, or maintain your Prerequisite Programmes (PRPs) against the specific requirements of ISO/TS 22002-1:2009 (often used in conjunction with ISO 22000).


8. Animal Management (if applicable)

8. Raw Materials & Supplier Approval

3. Utilities – Air, Water, and Energy

Food packaging often requires compressed air to blow-mold bottles or move materials. This air touches the food-contact surface.

Clause 11: Rework

| Check Item | Requirement | Status | Evidence | | :--- | :--- | :--- | :--- | | 11.1 | Rework is clearly identified and stored separately. | | | | 11.2 | Rework traceability (batch number, date, original product code). | | | | 11.3 | Rework usage is controlled (no allergen cross-contamination). | | | iso ts 220024 checklist top

The Checklist at the Top

Maya Vasquez had three hours to save two hundred jobs.

She stood in the silent, stainless-steel heart of ApexPak’s food-packaging line, the air thick with the smell of sanitizer and ozone. In her trembling hand was a tablet. On the tablet was a single document: ISO/TS 22002-4:2023 Checklist – Top Section (Management Commitment). This guide is structured to help you audit,

Three months ago, ApexPak was a mid-tier family business making yogurt cups and takeout clamshells. Then came the recall. A competitor’s liner failed; a child got sick. Now every major retailer demanded a new certification by noon today. Without it, ApexPak’s contracts would vanish by 5 PM.

Maya wasn’t the quality manager. She was the interim quality manager—promoted after the old one quit, screaming about “unfixable rot.” She was 29, over-caffeinated, and drowning. Animal health programs, welfare, and movement controls

But she had the checklist.

4. Site & Buildings